PCNA Consulting Group
  • Home
  • Services
    • Fire Engineering
    • Code Consulting
    • Accessibility Analysis
  • Projects
  • About
  • Team
  • Contact Us
  • More
    • Home
    • Services
      • Fire Engineering
      • Code Consulting
      • Accessibility Analysis
    • Projects
    • About
    • Team
    • Contact Us
PCNA Consulting Group
  • Home
  • Services
    • Fire Engineering
    • Code Consulting
    • Accessibility Analysis
  • Projects
  • About
  • Team
  • Contact Us

Public Facilities

Mesquite Animal Shelter Expansion & Renovation

  PCNA Group provided; code consulting, fire protection system analysis and egress design for the expansion and renovation approx. 4,000 SF shelter into an approx. 8,000 SF facility that was modified to better accommodate; animal intake, veterinary health care services, cat-adoption spaces and employee service spaces. This resulted in a significantly larger and better organized facility that was needed to address the rapidly growing population in the Mesquite, Nevada area. 

Lone Mountain Park - Equestrian Shade Structure

 This newly proposed 35,000 SF outdoor shade structure (intended to cover an earth-surface equestrian court) required automatic sprinklers per local 2012 IBC amendments. PCNA Group prepared an Alternate Methods & Materials request to justify omitting sprinklers for this non-combustible structure. This resulted in the project being able to be delivered on time and within the original budget constraints. 

Parkdale Community Center

   Project responsibilities   included ADA/ Accessibility   compliance review and Alternate Methods & Materials request for the new   Community Center Building. The Alternate allowed the existing (adjacent)   Senior Center building to remain as a non-sprinklered building. This project was delivered   on time, without unanticipated budget cost to the public.

UNLV Student Recreation Center

Project   responsibilities included plans-check review of building, fire,   accessibility, and egress elements for this 4-story student fitness center   with fitness, psychological counseling, and medical health clinic. The   building included “whole-building” atrium that required multiple active fire   protection systems in the design to achieve full code compliance. This   project was delivered on time and within budget.

Copyright © 2025 PCNA Consulting Group Inc - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept